home divider about us divider our services divider
our projects
divider
health and safety
divider
community
divider news divider contact us
{ Services }
Oil/Gas/Smelters  |  Ventilation  |  Mining  |  Dams  |  Pulp Mills  |  Mast Climbers
Dams

 

Chinook Scaffold Systems Ltd is as proficient in erecting scaffolding for dams as they are in all other industrial applications. Chinook has supplied and erected scaffolding to the following:

- Mica Dam (north of Revelstoke)
- The Corra Linn Dam (Kootenays)
- The lower and upper Bonnington Dams (Nelson BC)
- Brilliant Dam (Kootenay River)
- Waneta Dam (south of Trail)
- Seven Mile Dam (Trail)

- Revelstoke Dam
- Keenlyside Dam
- South Slocan Dam
- Duncan Dam
- Kootenay Canal Generating Station

A recent project at the Revelstoke Dam saw us building scaffolding that allowed the construction of four hundred and fifty linear feet of penstock. Twenty-six feet in diameter on a fifty-seven degree slope. We erected custom engineered scaffolding every six and a half feet along the sluices. We created slim three foot towers rising fifty feet. On the ground we built enormous fifty foot bridges which were then flown up and lowered into place. At the same time we created circular stairs that joined the towers and bridges. The completed structure allowed the contractor and welders to work at the correct height on every part of the project.

 

We are proud of our custom solutions to unique challenges. Dams are a big part of our business; each one is unique and each one requires unique solutions. We are the company that supplies the right solution every time.

 


  • (click image to enlarge)